Could I help you?

API Publ 4730

API Publ 4730 Groundwater Remediation Strategies Tool

standard by American Petroleum Institute, 12/01/2003

More details

Reduced price!
M00009261
New product
Limited time offer:

$62.10

$138.00

-55%

In stock

- +

Add to compare

 
More info

Full Description

This guide provides strategies for focusing remediation efforts on 1) the change in contaminant mass flux in different subsurface transport compartments (e.g. the vadose zone, smear zone or a zone within an aquifer of interest) and 2) the change in remediation timeframe.

In this approach, groundwater flow and contaminant concentration data are combined to estimate the rate of contaminant mass transfer past user-selected transects across a contaminant plume. The method provides the user with a means to estimate the baseline mass flux and remediation timeframe for various transport compartments and then evaluate how different remedies reduce the mass flux and the remediation timeframe in each transport compartment.

 
Custom tab

This is a custom block edited from admin panel.You can insert any content here.

30 other products in the same category:

Compare 0

No products

To be determined Shipping
$0.00 Total

Check out