Could I help you?

ASME PCC-3-2007 (R2012)

ASME PCC-3-2007 (R2012) Inspection Planning Using Risk-Based Methods, Includes Errata (2008)

standard by ASME International, 01/01/2008

More details

Reduced price!
M00005710
New product
Limited time offer:

$44.10

$98.00

-55%

In stock

- +

Add to compare

 
More info

Full Description

The risk analysis principles, guidance, and implementation strategies presented in this Standard are broadly applicable; however, this Standard has been specifically developed for applications involving fixed pressure-containing equipment and components. This Standard is not intended to be used for nuclear power plant components; see ASME BPV, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. It provides guidance to owners, operators, and designers of pressure-containing equipment for developing and implementing an inspection program. These guidelines include means for assessing an inspection program and its plan. The approach emphasizes safe and reliable operation through cost-effective inspection. A spectrum of complimentary risk analysis approaches (qualitative through fully quantitative) should be considered as part of the inspection planning process.

 
Custom tab

This is a custom block edited from admin panel.You can insert any content here.

30 other products in the same category:

Compare 0
AS ISO 11112:2021 1xAS ISO 11112:2021 $20.75

No products

To be determined Shipping
$20.75 Total

Check out