Full Description
Scope
The scope of this project is to prepare a corrigendum for C37.60-2003 to correct editorial and technical errors that have been identified since RevCom approval in early 2003. Four errors have been identified, others may surface now that the document has been published.
Purpose
The purpose of this project is to correct known errors in the published standard. This standard has been approved by the PE Switchgear Standards Main Committee for submittal to IEC for Dual Logo Status. The members feel that a corrigendum should be issued before that submittal is made.
Abstract
Corrigendum Standard - Superseded.Required definitions, ratings, procedures for performing design tests, production tests, and construction requirements for overhead, pad-mounted, dry vault, and submersible automatic circuit reclosers and fault interrupters for alternating systems up to 38 kV are specified.